LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 13 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità
  • Contatti

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
Alghero

Hydrogen trains, unions perplexed: «Risky and expensive project»

«Vehicles with costs five times higher than those of hybrids, without the certainty that they will be able to be approved in time»
26 maggio 2024 alle 11:21Aggiornato il 26 maggio 2024 alle 10:59
Hydrogen trains, unions perplexed: «Risky and expensive project»
Treni a idrogeno (archivio L'Unione Sarda)
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp
Argomenti similiSLOT_5
  • Sull’attenti, Pete
    Caffè Scorretto

    Sull’attenti, Pete

    Celestino Tabasso

Articoli correlati

Settimo San Pietro, renovation work begins at the Sports Hall.
The resolution

Settimo San Pietro, renovation work begins at the Sports Hall.

The project for the completion of the Via I Maggio structure has been approved.
Road accident victims: A day dedicated to prevention and solidarity in Settimo.
schools

Road accident victims: A day dedicated to prevention and solidarity in Settimo.

The initiative of the "Ciao more" association involved students on the topics of safe driving and organ donation
RAFFAELE SERRELI
Sassari, €100,000 from the government to the municipality for urban safety.
The allocation

Sassari, €100,000 from the government to the municipality for urban safety.

The funds from the Ministry of the Interior will be used for overtime for the local police, new lighting, cameras and projects in schools.
Emanuele Floris
Pula, notices for the 2026 TARI balance are arriving: payment by December 31st.
bills

Pula, notices for the 2026 TARI balance are arriving: payment by December 31st.

The Municipality has begun sending out communications to taxpayers. Payment must be made in a single payment using the attached payment slip or downloadable from the online portal.
Ivan Murgana
Isili, controversy over the canteen: parents are demanding coverage for children's transit between buildings.
the appeal

Isili, controversy over the canteen: parents are demanding coverage for children's transit between buildings.

The little ones were forced to go outside in the rain
Sonia Gioia
Quartucciu, waste dumping: a business owner and two residents reported by local police
Sardinia

Quartucciu, waste dumping: a business owner and two residents reported by local police

Local police checks between the new SS 554 bis and the town center: an open-air landfill site has been reclaimed, and fines are imposed for bags left on the street.
Matteo Cabras
Sassari, fear in Corso Trinità: car engulfed in flames
The fire

Sassari, fear in Corso Trinità: car engulfed in flames

The driver had time to pull over before the vehicle caught fire.
Emanuele Floris
Sassari: Jackets and scarves stolen: arrested
safety

Sassari: Jackets and scarves stolen: arrested

Attempted lightning theft at Upim on Viale Italia: goods returned
Emanuele Floris
ProPal demonstration in Sassari, investigation closed: 17 accused of roadblock
the investigation

ProPal demonstration in Sassari, investigation closed: 17 accused of roadblock

The Prosecutor's Office also contests the interruption of public service
Emanuele Floris

«The news on the 140 million euro ARST project for the rail connection with Alghero airport, with hydrogen trains, leaves many questions open and presents considerable risks that at the deadline, June 2026, the money will have to be returned». This is the position of the general secretary of the Sardinian CISL, Pier Luigi Ledda , and of the general secretary of the Fit, Claudia Camedda .

"These are - explain the two trade unionists - hydrogen trains purchased at a considerable cost, equal to approximately five times that of a hybrid train and, considering that they are prototypes, without the absolute certainty that they will be approved by that date".

Ledda and Camedda express « questions and doubts about the project as a whole, starting from what concerns the photovoltaic system and the electrolyser for the production of hydrogen . The concern concerns the need not to compromise agricultural areas, given that their sizing for operational use is unclear. And then the critical issues related to the storage and transport of possibly surplus hydrogen."

«It is necessary - according to Ledda and Camedda - to move within planning and investments that look at the complexity of the railway system and network , which are placed within the coordination of the public transport service, which are part of a project to strengthen collective transport".

The rail connection with these methods therefore confirms the doubts that Fit and Cisl had highlighted at the time, «including the fact that to go to the airport you will have to change trains at Mammuntanas with your luggage . We are evidently in the presence of a choice outside of any serious planning - the conclusion - while the resources should be invested in the modernization of the Alghero Sassari Sorso railway, making it a true metropolitan train with adequate frequencies, safety, speed and comfort".

(Unioneonline/vl)

© All rights reserved