LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 15 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità
  • Contatti

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
the project

Porto Torres, over 4 million euros to restore the Roman bridge

The tender for the consolidation interventions of the ancient infrastructure, dating back to the imperial age, is open
Mariangela Pala
6 maggio 2023 alle 09:24Aggiornato il 6 maggio 2023 alle 09:23
Porto Torres, over 4 million euros to restore the Roman bridge
Il Ponte Romano (Foto Pala)
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp

New tender for the award of the contract for the consolidation and restoration of the ancient Roman bridge, the monument with seven arches built in the imperial age in Porto Torres, considered among the most important in Sardinia due to its excellent state of conservation.

The executive project financed by the Regional Secretariat of the Ministry of Culture for Sardinia, is divided into two lots, comprising a first intervention equal to 3 million and 350 thousand euros and a second of 700 thousand euros. Both lots will be awarded to a single operator. The works involve the consolidation of the foundation structures of the west abutment and of the sixth pier by inserting valved micropiles in stainless steel built starting from the road surface.

Reinforcement of the underlying soil by injecting lime-based mortars is also planned. The six columns and the two abutments will be filled with filling material by injecting mixtures based on natural lime.

Furthermore, we will proceed with the insertion of transversal ties to the full width of the bridge in all seven arches with stitching with stainless steel helical bars in the split sections replacing the degraded ones. Also planned is the construction of the raised walkway in galvanized and painted steel along the entire development of the bridge, equipped with signal lighting.

The restoration involves the stone facing, sides, arches, piles and abutments of the bridge. Finally, the conservative restoration of the paving is planned, with the arrangement of the access areas to the bridge on the two banks, with the reconstruction of the pavement, the insertion of bollards for vehicles and stairways to connect the differences in level.

The object of the public notice is the tender for the execution and completion of all the works envisaged in the executive project which has identified the archaeologist Patrizia Tomassetti as responsible for the procedure.

© All rights reserved

Argomenti similiSLOT_6
  • I cambiamenti
    Caffè Scorretto

    I cambiamenti

    Tacitus

Articoli correlati

A four-hour flight from Elmas Airport postponed the match between Roma 1927 and Monastir 1983.
Five-a-side football

A four-hour flight from Elmas Airport postponed the match between Roma 1927 and Monastir 1983.

The white and blues were unable to reach the capital for the Serie B match scheduled for 3pm. The Sardinian club will appeal to obtain the rescheduling
Antonio Serreli
Alghero, fears at the Santa Maria La Palma dog shelter: warehouse on fire
The fire

Alghero, fears at the Santa Maria La Palma dog shelter: warehouse on fire
The alarm was raised around 6 p.m. for a fire that broke out in a warehouse. The firefighters' quick intervention prevented injuries to the workers and the animals housed there.
Catherine Flowers
Two girls rescued after being lost in the dark and rain near the Capo Nieddu waterfalls.
Cuglieri

Two girls rescued after being lost in the dark and rain near the Capo Nieddu waterfalls.

The alarm was raised shortly before the cell phone ran out of battery. They were located near a nuraghe thanks to the geolocation of the call.
Piles of fishing nets to be recycled: the Vox Maris project in Porto Torres
environment

Piles of fishing nets to be recycled: the Vox Maris project in Porto Torres

The BioDesign Foundation's project removed spent equipment abandoned on the docks. The operation was featured in a documentary directed at Brussels.
Mariangela Pala
San Vero Milis: The Pinna brothers leave all their assets to the municipality.
the donation

San Vero Milis: The Pinna brothers leave all their assets to the municipality.

However, one property will be converted into a senior center. The resolution accepting the inheritance will be approved by the Council on Monday.
Sara Pinna
Seneghe, rural road network: the Attopiziu-Sirisi road has been upgraded.
Infrastructure

Seneghe, rural road network: the Attopiziu-Sirisi road has been upgraded.

The road, which had been in a state of disrepair for decades, has been repaired. Mayor Albina Mereu: "Let's restore dignity and a future to our countryside."
Joseph Pintus
Temporary healthcare workers to be made permanent: protests outside the Regional Council on Tuesday
healthcare

Temporary healthcare workers to be made permanent: protests outside the Regional Council on Tuesday

A demonstration has been scheduled for Tuesday, November 17th, in front of the Chamber on Via Roma. Angioni: "It's unacceptable to discriminate against those who have ensured the stability of departm…
Ollastra, a morning dedicated to memory and legality with Falcone's escort car
the initiative

Ollastra, a morning dedicated to memory and legality with Falcone's escort car

In a display case, the vehicle destroyed in the Capaci massacre of May 23, 1992.
Sara Pinna
Quartu: Waste bins on pedestrian crossings on Via Polonia: residents protest
environment

Quartu: Waste bins on pedestrian crossings on Via Polonia: residents protest

Containers from some businesses remain for days on newly resurfaced crossings. Residents are calling for action after recent checks targeted only domestic users.
Georgia Daga