LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 12 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
Home
porto torres

The discoveries on the Roman Bridge: a defense against the floods of the Rio Mannu

For the implementation of the entire project to enhance the entire Rio Mannu area, the estimated costs are equal to 12 million euros
Mariangela Pala
7 marzo 2024 alle 10:41Aggiornato il 7 marzo 2024 alle 10:40
The discoveries on the Roman Bridge: a defense against the floods of the Rio Mannu
La presentazione delle scoperte (foto Pala)
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp

A city wall or structures somehow connected to the channeling of the river, therefore to the protection of the ancient city of Turris from the flooding and power of the Rio Mannu.

These are the first hypotheses that the archaeological official of the Superintendence, Nadia Canu together with the archaeologist Luca Sanna, in their speech during the conference in Porto Torres entitled "Navigum Isidis: oriental cults in Turris Libisonis between port development and cultural exchanges", have put forward compared to the latest archaeological excavations on the eastern bank of the river, near the Roman Bridge. A preventive excavation test aimed at the construction of the Fluvial Pit, the project on the "Hydraulic defense works against the flooding of the Mannu river in Porto Torres", for which funds of approximately 6.4 million had been allocated by the Region.

For the implementation of the entire project to enhance the entire Rio Mannu area, the estimated costs are equal to 12 million euros. The plan started in 2010 thanks to the archaeologist Antonietta Boninu, has finally entered the operational phases in 2022 with the first archaeological surveys. The new research has confirmed that the ancient road plan proceeds on the mainland directly on the rocky surface, with an arrangement which where preserved presents pebbles bound with mortar, continuing to lower and then rise significantly after about 20 metres. «We started in 2022 with the first excavation test», explains Nadia Canu, who takes care of the scientific direction of the project, «on the basis of the investigations carried out with the georadar by Gaetano Ranieri of the University of Cagliari, who had highlighted various anomalies in depth". By virtue of this documentation, the Municipality of Porto Torres and the Superintendency have agreed to start seven excavation tests, each measuring ten by ten square metres.

«So we began the first essay following the anomalies reported by Professor Ranieri. But all the tests carried out both in the north and in the south have been a failure. So we decided to change strategy and also trust our intuition. In this phase we discovered an emerged linear structure about thirty meters below the bridge. The first hypothesis is that it was connected with the city walls hypothesized by Enrico Petruzzi in 2018, who had defined the course of the walls up to the mouth of the bridge". City walls or structure capable of channeling the waters of the river or, again, docks? The next archaeological investigations will resume in mid-March. «On the interpretations of the discoveries, I believe we will soon understand what it is about», explains Luca Sanna, coordinator of the works «but on the hypothesis of the function of safeguarding the city with respect to river floods, we can see, from some simulations, how this structure came to light, it could somehow channel the water under the arches of the bridge."

© All rights reserved

Argomenti similiSLOT_11
  • Da che parte sta?
    Caffè Scorretto

    Da che parte sta?

    Tacitus

Articoli correlati

Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."
the emergency

Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."

The prime minister called on the opposition and reassured them in a video on social media: "Nothing was found in the institutions. Those who send these threats want a nation that is terrified and fea…
Majority summit: "Forward with the statute, but no changes to the electoral law."
region

Majority summit: "Forward with the statute, but no changes to the electoral law."
The draft is ready and at the next session the special commission will begin examining all the articles.
Roberto Murgia
Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."
Sassari

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."

In the grounds of appeal, a flurry of objections raised by the lawyers to the regularity of the conviction sentence of the Tempio Tribunal
Andrea Busia
Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.
the alarm

Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.

The verdict from the Teramo zooprophylactic institute is the first case in the municipality.
Roberto Secci
The eighteenth edition of the Carbonia Film Festival kicks off
cinema

The eighteenth edition of the Carbonia Film Festival kicks off

This morning, the Skan mural was unveiled at the ticket office, and the festival officially opens this afternoon. The event will get into full swing in the coming days.
MARCO CORRIAS
Salerno, a new adventure in the Eccellenza league: he will coach the Tortolì women's team.
soccer

Salerno, a new adventure in the Eccellenza league: he will coach the Tortolì women's team.

The 42-year-old coach returns to the bench, in a completely different context than those he has faced so far
Roberto Secci
Kimi Antonelli with his tricolor hair, Mercedes: "No words."
the champion

Kimi Antonelli with his tricolor hair, Mercedes: "No words."

In the video posted by the team, Kimi arrives at the headquarters, Wolff is incredulous: "Did you even pay?"
Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years
Olbia

Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years

In 2010, raids took place in Porto Cervo and Olbia, with the villa of an undersecretary of Labour and the residence of a Roman countess also targeted.
Andrea Busia
Ciro Grillo trial: appeal faces immediate risk of postponement
court

Ciro Grillo trial: appeal faces immediate risk of postponement

The defense: "A judge's signature is missing; the first-instance ruling must be retried."

The infrastructure today lacks two rows, so originally it must have been about 60 meters higher. In case the flood was even greater, the lower part of the bridge acted as a canal, with a rise. The bridge in its nineteenth-century configuration acted as a dam and therefore carried the water towards the city. «The river Pit project does nothing more than restore the Roman-era plan - observes Sanna - slightly higher to protect the stretch of road, but nothing more than the rediscovery of the Pit from almost two thousand years ago». The structure discovered, therefore, would have had a very specific function: that of channeling the water under the arches of the Roman Bridge and, in the event of a major flood, allowing these constructions to be overcome to use the lower part of the bridge as a canal. to support flood maintenance away from the city, a structure that appears waterproofed due to the presence of a layer of mortar. "To better understand a triangular area will be investigated, to evaluate the stratigraphic deposit downstream and any chronologies upstream which we hope will provide some more answers."