LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 12 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
The projects

Bitti, over 3.9 million euros for the reconstruction of 4 km of pipelines

Work after the damage caused by the 2020 flood
29 giugno 2023 alle 11:57Aggiornato il 29 giugno 2023 alle 11:55
Bitti, over 3.9 million euros for the reconstruction of 4 km of pipelines
Perdite d'acqua (immagine simbolo, foto Ansa)
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp
Argomenti similiSLOT_6
  • Da che parte sta?
    Caffè Scorretto

    Da che parte sta?

    Tacitus

Articoli correlati

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."
Sassari

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."

In the grounds of appeal, a flurry of objections raised by the lawyers to the regularity of the conviction sentence of the Tempio Tribunal
Andrea Busia
Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.
the alarm

Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.

The verdict from the Teramo zooprophylactic institute is the first case in the municipality.
Roberto Secci
Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."
the emergency

Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."

The prime minister called on the opposition and reassured them in a video on social media: "Nothing was found in the institutions. Those who send these threats want a nation that is terrified and fea…
Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years
Olbia

Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years

In 2010, raids took place in Porto Cervo and Olbia, with the villa of an undersecretary of Labour and the residence of a Roman countess also targeted.
Andrea Busia
Ciro Grillo trial: appeal faces immediate risk of postponement
court

Ciro Grillo trial: appeal faces immediate risk of postponement

The defense: "A judge's signature is missing; the first-instance ruling must be retried."
Cabras, the Casula family's historic supermarket is closing: "We can't keep going."
in the center

Cabras, the Casula family's historic supermarket is closing: "We can't keep going."

In Corso Umberto, the shutters will be lowered after 80 years of activity.
Sara Pinna
Sassari: Drunk man hits nurse in ER lip
the violence

Sassari: Drunk man hits nurse in ER lip

The man was arrested by the Carabinieri, and the victim was given ten days of treatment.
Emanuele Floris
Quartu, workshops and guided tours dedicated to tradition
the event

Quartu, workshops and guided tours dedicated to tradition

The “Tramudas” festival, organised by the Sa Cobula association with the natural shopping centre, makes its debut on Thursday
Georgia Daga
The book "Walking in Silence" will be presented in Nuoro.
The meeting

The book "Walking in Silence" will be presented in Nuoro.

The volume edited by researcher Mariella Napolitano will be presented on Friday

Green light from Egas to the two executive projects for the reconstruction of about 4 km of both water and sewage pipelines in the town of Bitti , already in critical condition and seriously compromised by the flood that occurred on November 28, 2020 .

The total investment is over 3.9 million euros to be paid by the RAS, financed with the fund for national emergencies as part of the urgent intervention plan.

For the interventions that will specifically concern the sewage system, 2 million 930 thousand euros are foreseen and will be used to replace 2.4 km of old collectors and the reconstruction of the connections .

The urban sewage network of the municipality of Bitti currently presents a high degree of dilapidation subject to continuous losses, worsened following the flood, and with a constant need for repairs.

The works approved by Egas will mainly concern the historic center and some peripheral areas and the streets involved will be via Monte Zebio, via Arborea, via Nino Bixio, via Brescia, Corso Vittorio Veneto and districts, via Tolmino, via Oslavia, via Brigata Reggio, via Brigata Sassari, via Trento, via Papa Giovanni XXIII, via Sa Pineta, via Mameli, via Sicilia, via Roma, via Marconi, via Cavallotti, piazza Asproni, via Deffenu.

On the other hand, 1 million and 43 thousand euros will be invested for the redevelopment of the water pipes, which will be used to replace 1,462 meters of old pipes .

Based on the technical assessments contained in the project, the network is characterized by highly critical situations due to the precarious conditions of the main pipes and connections, which are obsolete and whose conditions have worsened after the events of November 2020.
The interventions will be mainly concentrated in the historic centre, in the area of via Cavallotti, the artisan area and the recently urbanized area located in the north of the town and precisely in via Dore.

The works will be useful not only to improve the water service and therefore the flow of water to the houses, but also to limit the inconvenience in the event of maintenance and interventions by the sole manager: in fact, the number of gate valves will also be implemented which will allow greater control over the network and will therefore allow, in the event of an intervention, to shut off the water supply exclusively where it is needed and not in very large portions without there being a need and as, however, has occurred up to now.

The works envisaged in this project will specifically concern via Brigata Reggio, via Dalmazia, via Tolmino, via Roma, via Nuoro, via Mameli, via Marconi, vicolo Marconi, via Trento, via Cavallotti, via Montanara, Loc. Lampione, via Pau, Trav. S'arginamentu, via Dore.

(Unioneonline/vl)

© All rights reserved