LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 12 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
The works

Cyclone Cleopatra, the final act for the road of shame: after 12 years, the SP 38 will be completed.

In November 2013, a tragic flood and the opening of a sinkhole cost the lives of three people. Anas awarded the contract to complete the work: €10 million available, opening by 2026.
Andrea Busia
14 novembre 2025 alle 19:47Aggiornato il 14 novembre 2025 alle 20:30
Cyclone Cleopatra, the final act for the road of shame: after 12 years, the SP 38 will be completed.
A sinistra la strada ultimata dopo i lavori, a destra come era subito dopo il crollo
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp
Argomenti similiSLOT_2
  • Da che parte sta?
    Caffè Scorretto

    Da che parte sta?

    Tacitus

Articoli correlati

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."
Sassari

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."

In the grounds of appeal, a flurry of objections raised by the lawyers to the regularity of the conviction sentence of the Tempio Tribunal
Andrea Busia
Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.
the alarm

Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.

The verdict from the Teramo zooprophylactic institute is the first case in the municipality.
Roberto Secci
Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."
the emergency

Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."

The prime minister called on the opposition and reassured them in a video on social media: "Nothing was found in the institutions. Those who send these threats want a nation that is terrified and fea…
Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years
Olbia

Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years

In 2010, raids took place in Porto Cervo and Olbia, with the villa of an undersecretary of Labour and the residence of a Roman countess also targeted.
Andrea Busia
Ciro Grillo trial: appeal faces immediate risk of postponement
court

Ciro Grillo trial: appeal faces immediate risk of postponement

The defense: "A judge's signature is missing; the first-instance ruling must be retried."
Cabras, the Casula family's historic supermarket is closing: "We can't keep going."
in the center

Cabras, the Casula family's historic supermarket is closing: "We can't keep going."

In Corso Umberto, the shutters will be lowered after 80 years of activity.
Sara Pinna
Sassari: Drunk man hits nurse in ER lip
the violence

Sassari: Drunk man hits nurse in ER lip

The man was arrested by the Carabinieri, and the victim was given ten days of treatment.
Emanuele Floris
Quartu, workshops and guided tours dedicated to tradition
the event

Quartu, workshops and guided tours dedicated to tradition

The “Tramudas” festival, organised by the Sa Cobula association with the natural shopping centre, makes its debut on Thursday
Georgia Daga
The book "Walking in Silence" will be presented in Nuoro.
The meeting

The book "Walking in Silence" will be presented in Nuoro.

The volume edited by researcher Mariella Napolitano will be presented on Friday

Next Tuesday, Sardinia will remember the victims of Cyclone Cleopatra . Twelve years have passed since the tragic flood . And perhaps these hours have brought an end to the scandal of the Olbia-Tempio highway, the Monte Pino section of the road closed on November 18, 2013, and never used again . A sinkhole opened on Provincial Road 38, killing three people.

Anas has finally entrusted Vitali Costruzioni with the completion of the previously unfinished section of road managed by the Province of Sassari. If all goes according to plan, the road will be safe to use by 2026 .

A long-awaited breakthrough for the road connecting Olbia with Tempio and Alta Gallura. The result was made possible thanks to an agreement between Anas, the Region, and the Province of Northeast Italy. Approximately ten million euros are available .

The Vitali Group, which has already completed the first section of the provincial road (where the collapse occurred), will complete the work with the construction of about twenty hydraulic crossings and asphalt. The regional councilor for Public Works, Antonio Piu, will be at the construction site next Tuesday for the commemoration of the victims.

And there's more good news for road traffic in the northeast of the island. Anas will intervene, as part of a €4 million plan, to improve road safety on the Sassari-Tempio (SS 672 and SS 127) following several landslides.

In Cagliari, an agreement was also signed between the Region and the Municipality of Tempio for funding (€27 million) that will allow for the construction of a new section of Provincial Road 133 (Tempio – Aglientu junction). The project will shorten travel times on the affected section, and with the straightening of the road and the construction of the Abba viaduct, numerous curves will be eliminated.

© All rights reserved