LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 12 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
Carlo Felice

Endless construction on the Fenosu bridge: it has been going on for 16 years

Anas: «We have not forgotten»
10 novembre 2023 alle 12:10Aggiornato il 10 novembre 2023 alle 12:38
In attesa delle preferenze privacy...
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp

Two hundred and thirty kilometers tormented by diversions, endless construction sites and restrictions. From Cagliari to Sassari (and vice versa) State Road 131 is a concentration of dangers that turns every journey into a nightmare for motorists. But there is a precise point on the Carlo Felice which has carved out a curious record for itself: at kilometer 93, at Fenosu (southbound), for years the roadway has been reduced to a single lane for a few hundred metres. Works in progress? Nope, not even a shadow of workers. An apparently unjustified interruption for those passing by: no collapse in the asphalt, guardrail intact, yet the signs indicate the closure of a lane for a short interval of road.

From the National Autonomous State Roads Company they clarify: «At kilometer 93 of state road 131, in the locality of Fenosu, there is a bridge. During a periodic inspection, which Anas carries out on its structures every three months, a deterioration was found. As a precaution, to protect traffic, a narrowing was established in May 2022, only on the carriageway towards Cagliari, which has not currently had any repercussions on traffic".

Long times

The fact is that for eighteen months (says Anas but those who travel along the 131 daily swear that there are many more), motorists have been forced to stick to a single lane, with the resulting safety problems. It is certainly not the first time that the section above the bridge has been affected by load tests: already in March 2007, announcing the modernization of the Carlo Felice, Anas communicated «the load tests for the static testing of the bridge to height of km 93.070 of state road 131" and consequently "traffic coming from Sassari and heading to Cagliari, Oristano, Fenosu will be diverted onto state road 338 in the direction of Oristano". And today the same danger highlighted 16 years ago. For the moment, a precautionary closure to preserve the stretch in poor condition: a real construction site does not yet exist, but it could open soon if checks highlight the need for safety measures.

«Further investigations»

«We have not forgotten about the construction site - the Anas press office continues - in this period of time which may seem excessive to non-experts, a series of checks have been carried out. An external professional was appointed who carried out a series of investigations into the structure. Further investigations are planned in the coming weeks, as well as a load test which will allow, together with the previous analyzes already carried out, to precisely define the limits of use of the work of art, and future interventions on the structure". These are routine checks which this time must take into account the critical signs highlighted during the surveys which are periodically carried out by Anas technicians.

© All rights reserved

Argomenti similiSLOT_2
  • Da che parte sta?
    Caffè Scorretto

    Da che parte sta?

    Tacitus

Articoli correlati

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."
Sassari

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."

In the grounds of appeal, a flurry of objections raised by the lawyers to the regularity of the conviction sentence of the Tempio Tribunal
Andrea Busia
Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.
the alarm

Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.

The verdict from the Teramo zooprophylactic institute is the first case in the municipality.
Roberto Secci
Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."
the emergency

Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."

The prime minister called on the opposition and reassured them in a video on social media: "Nothing was found in the institutions. Those who send these threats want a nation that is terrified and fea…
Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years
Olbia

Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years

In 2010, raids took place in Porto Cervo and Olbia, with the villa of an undersecretary of Labour and the residence of a Roman countess also targeted.
Andrea Busia
Ciro Grillo trial: appeal faces immediate risk of postponement
court

Ciro Grillo trial: appeal faces immediate risk of postponement

The defense: "A judge's signature is missing; the first-instance ruling must be retried."
Cabras, the Casula family's historic supermarket is closing: "We can't keep going."
in the center

Cabras, the Casula family's historic supermarket is closing: "We can't keep going."

In Corso Umberto, the shutters will be lowered after 80 years of activity.
Sara Pinna
Sassari: Drunk man hits nurse in ER lip
the violence

Sassari: Drunk man hits nurse in ER lip

The man was arrested by the Carabinieri, and the victim was given ten days of treatment.
Emanuele Floris
Quartu, workshops and guided tours dedicated to tradition
the event

Quartu, workshops and guided tours dedicated to tradition

The “Tramudas” festival, organised by the Sa Cobula association with the natural shopping centre, makes its debut on Thursday
Georgia Daga
The book "Walking in Silence" will be presented in Nuoro.
The meeting

The book "Walking in Silence" will be presented in Nuoro.

The volume edited by researcher Mariella Napolitano will be presented on Friday

It is useless to look for reports of work in progress on the virtual map that Anas makes available to users on the "Construction site info" page: at kilometer 93 on the line that traces state road 131, there are no green dots to indicate workers at work. But then again there have never really been any workers.

Marianna Guarna