LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 12 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
Public building

Housing Area, 8 million arriving in the Island for maintenance

The four capitals and many other Sardinian municipalities are affected

7 aprile 2022 alle 17:57
Housing Area, 8 million arriving in the Island for maintenance
Cagliari (foto Ansa)
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp
Argomenti similiSLOT_14
  • Da che parte sta?
    Caffè Scorretto

    Da che parte sta?

    Tacitus

Articoli correlati

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."
Sassari

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."

In the grounds of appeal, a flurry of objections raised by the lawyers to the regularity of the conviction sentence of the Tempio Tribunal
Andrea Busia
Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.
the alarm

Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.

The verdict from the Teramo zooprophylactic institute is the first case in the municipality.
Roberto Secci
Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."
the emergency

Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."

The prime minister called on the opposition and reassured them in a video on social media: "Nothing was found in the institutions. Those who send these threats want a nation that is terrified and fea…
Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years
Olbia

Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years

In 2010, raids took place in Porto Cervo and Olbia, with the villa of an undersecretary of Labour and the residence of a Roman countess also targeted.
Andrea Busia
Ciro Grillo trial: appeal faces immediate risk of postponement
court

Ciro Grillo trial: appeal faces immediate risk of postponement

The defense: "A judge's signature is missing; the first-instance ruling must be retried."
Cabras, the Casula family's historic supermarket is closing: "We can't keep going."
in the center

Cabras, the Casula family's historic supermarket is closing: "We can't keep going."

In Corso Umberto, the shutters will be lowered after 80 years of activity.
Sara Pinna
Sassari: Drunk man hits nurse in ER lip
the violence

Sassari: Drunk man hits nurse in ER lip

The man was arrested by the Carabinieri, and the victim was given ten days of treatment.
Emanuele Floris
Quartu, workshops and guided tours dedicated to tradition
the event

Quartu, workshops and guided tours dedicated to tradition

The “Tramudas” festival, organised by the Sa Cobula association with the natural shopping centre, makes its debut on Thursday
Georgia Daga
The book "Walking in Silence" will be presented in Nuoro.
The meeting

The book "Walking in Silence" will be presented in Nuoro.

The volume edited by researcher Mariella Napolitano will be presented on Friday

Eight million ready to be reinvested in the maintenance and upgrading of Area housing.

This is what the lines of the second program for the use of the proceeds relating to past years and deriving from rents that the regional housing company will reinvest, as approved today by the Council on the proposal of the Councilor for Public Works, Aldo Salaris .

The municipalities concerned include Cagliari, Sassari, Nuoro, Oristano, and again Sestu, Alghero, Porto Torres, Macomer, Iglesias, Carbonia, Villacidro, Guspini, Quartu, Serramanna, Serrenti, Arbus, Dorgali, Decimoputzu, San Vito, Masullas, Orosei , Sardinian Bari, Bitti, Bortigali, Bonorva, Ozieri, Nule.

"The emergency and housing deprivation remain central to the agenda of the Region and this further programming of resources is the truest testimony of this", explains Governor Christian Solinas.

"We are talking about an impressive program of reinvestment of resources to be allocated to interventions on existing assets and the completion of new buildings", adds the commissioner Salaris. “With this further and awaited measure, we are meeting the needs of families in difficulty, giving concrete answers to those who are waiting for accommodation or those living in precarious conditions and guaranteeing a home even for young couples in unfavorable economic conditions. Housing policies are a fundamental component for us: with dedicated measures and maximum attention to housing, we are in fact committed to forming a more equitable system, attentive to the needs of the most fragile families and oriented towards the dignity of people ".

THE WORKS - Thanks to the resource reinvestment plan, extraordinary maintenance interventions will be carried out on the accommodation in via Tintoretto in Cagliari (467,016 euros); extraordinary maintenance work on housing in via Gramsci, via Pani and via Rinascita in Arbus (€ 528,000); removal of architectural barriers in Cagliari, Guspini, Quartu, Serramanna, Serrenti, Sestu and Villacidro (350,000); interventions to secure the roofs of the buildings in via Zurru in Donori (350,000); consolidation of the floors and maintenance of the building systems in via S'acqua Cotta in Decimoputzu (150,000 euros); recovery of 35 residual apartments in Arbus, Guspini, San Vito, Serrenti and Villacidro (715,000); renovation and redevelopment of 10 apartments in via A. Moro in Iglesias (800,000 euros); restructuring and redevelopment interventions in Carbonia "From coal to the sun" (648,700 euros). Again: conversion to ERP of 3 apartments in via Nora in Oristano (280,000); building consolidation works (2 apartments) in via Desogus in Masullas (100,000 euros); extraordinary maintenance of 4 buildings and 32 apartments in via Kennedy in Oristano (300,000) and of other 2 buildings and 20 apartments in via F. Prinetti, also in Oristano (220,000).

Also included in the program are the completion of the new construction for 22 apartments, in the locality of Scalarba, in Macomer (470,000); 40 lodgings in viale Funtana Buddia in Nuoro (213,341 euros); 12 lodgings, in Folai in Orosei (150,000 euros); 12 lodgings in Canali in Bari Sardo (300,000 euros). Again: extraordinary maintenance work on 15 apartments in via M. Sanna in Bitti (32,700 euros); extraordinary maintenance work on 5 apartments in Bortigali (195,242 euros); renovation and redevelopment of 4 apartments in Nule (€ 87,000); completion of 56 apartments in via G. Deledda in Sassari (€ 375,000).

Finally, as regards the latest renovation and redevelopment works, the future modernization plan includes 16 apartments in via De Gasperi in Alghero (640,000 euros); 12 lodgings in P.zza M. Mannu in Ozieri (480,000 euros); 11 lodgings in via Calabria in Porto Torres (440,000 euros); 8 apartments in via A. Moro in Bonorva (328,000 euros).

(Unioneonline / vl)

© All rights reserved