LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 12 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
the project

La Maddalena, north side of Lungomare Mirabello to be redeveloped: the works after the summer

350 thousand euros available for the intervention which also includes new sidewalks, benches and the installation of two charging stations for electric cars
Claudio Modesto Ronchi
17 gennaio 2023 alle 10:32Aggiornato il 17 gennaio 2023 alle 10:03
La Maddalena, north side of Lungomare Mirabello to be redeveloped: the works after the summer
La Maddalena, l'anteprima del progetto Lungomare Mirabello (foto concessa)
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp
Argomenti similiSLOT_6
  • Da che parte sta?
    Caffè Scorretto

    Da che parte sta?

    Tacitus

Articoli correlati

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."
Sassari

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."

In the grounds of appeal, a flurry of objections raised by the lawyers to the regularity of the conviction sentence of the Tempio Tribunal
Andrea Busia
Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.
the alarm

Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.

The verdict from the Teramo zooprophylactic institute is the first case in the municipality.
Roberto Secci
Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."
the emergency

Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."

The prime minister called on the opposition and reassured them in a video on social media: "Nothing was found in the institutions. Those who send these threats want a nation that is terrified and fea…
Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years
Olbia

Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years

In 2010, raids took place in Porto Cervo and Olbia, with the villa of an undersecretary of Labour and the residence of a Roman countess also targeted.
Andrea Busia
Ciro Grillo trial: appeal faces immediate risk of postponement
court

Ciro Grillo trial: appeal faces immediate risk of postponement

The defense: "A judge's signature is missing; the first-instance ruling must be retried."
Cabras, the Casula family's historic supermarket is closing: "We can't keep going."
in the center

Cabras, the Casula family's historic supermarket is closing: "We can't keep going."

In Corso Umberto, the shutters will be lowered after 80 years of activity.
Sara Pinna
Sassari: Drunk man hits nurse in ER lip
the violence

Sassari: Drunk man hits nurse in ER lip

The man was arrested by the Carabinieri, and the victim was given ten days of treatment.
Emanuele Floris
Quartu, workshops and guided tours dedicated to tradition
the event

Quartu, workshops and guided tours dedicated to tradition

The “Tramudas” festival, organised by the Sa Cobula association with the natural shopping centre, makes its debut on Thursday
Georgia Daga
The book "Walking in Silence" will be presented in Nuoro.
The meeting

The book "Walking in Silence" will be presented in Nuoro.

The volume edited by researcher Mariella Napolitano will be presented on Friday

"It is a road and pedestrian section that deserves redevelopment ", says the councilor for public works Federica Porcu , who recently brought to the council and had the final redevelopment project of the Ammiraglio Mirabello seafront approved. The intervention will be on the north side of the road, the one opposite the sea, including, on the right, between the roundabout of the Primo Longobardo cinema-theater, the MM Tennis and the Non-commissioned officers' club, for the construction of which 350 thousand euros are available. A large relief with the inscription “La Maddalena”, flowerbeds , wider sidewalks , two charging stations for electric cars , a pergola structure , benches , a particular flooring that keeps the pines in place without causing damage to the roots is what the project.

«In the first section , the one that starts from the Longobardo roundabout to the parking area - informs the councilor - the sidewalk, without narrowing the roadway, will be brought to a width of one and a half meters. Along the promenade, two L-shaped rest areas will be created, with concrete seats covered in wood. In the large flower bed, largely sloping, a turf bordered by colored shrub species will be arranged. In the highest part - continues the commissioner Porcu - there will be the scenographic and decorative writing in relief, "La Maddalena" with colored draining concrete: ».

In the second section , the one now included between the paved parking lot and the Non-Commissioned Officers Club, there will be an extension of the previous sidewalk , with an average width of 2 meters, with a free space of about 18 meters for the circulation, transit and crossing of direct cars towards the houses adjacent to the area. In the final stretch of the sidewalk, towards the internal side of the car park, two charging stations for electric cars will be installed. In this section of the promenade it is envisaged to build a pergola structure with Y-shaped modular elements in aluminium, spaced apart and covered with a metal grating with the dual function of shading structure and support for a field of photovoltaic modules for the production of electricity for powering the two charging stations. In the third section , from the circular masonry staircase (which remains, albeit with maintenance) to the Non-Commissioned Officers Club building, the sidewalk will be redone by removing the asphalt along the part currently occupied by the car parking stalls near the pine trees. Finally, the project envisages the construction of a covered shelter , with a metal structure and wooden bench, for the new bus stop. " The works will start after the season ", specifies the councilor Porcu, "in order not to create too many inconveniences to the viability of that stretch, as there is also the open construction site of the cycle path, the end of which is expected before the season".

© All rights reserved