LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 12 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
ENVIRONMENT

Monserrato, goodbye to the dirt road on Via Porto Botte: a new park and 87 parking spaces are coming.

The Metropolitan City has approved the redevelopment project for the area next to the Via Caracalla metro station: green spaces, pedestrian paths and a reorganization of the road system.
Ennio Neri
26 ottobre 2026 alle 16:50Aggiornato il 26 ottobre 2026 alle 17:06
Monserrato, goodbye to the dirt road on Via Porto Botte: a new park and 87 parking spaces are coming.
Nuovo parco di Monserrato
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp
Argomenti similiSLOT_6
  • Da che parte sta?
    Caffè Scorretto

    Da che parte sta?

    Tacitus

Articoli correlati

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."
Sassari

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."

In the grounds of appeal, a flurry of objections raised by the lawyers to the regularity of the conviction sentence of the Tempio Tribunal
Andrea Busia
Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.
the alarm

Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.

The verdict from the Teramo zooprophylactic institute is the first case in the municipality.
Roberto Secci
Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."
the emergency

Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."

The prime minister called on the opposition and reassured them in a video on social media: "Nothing was found in the institutions. Those who send these threats want a nation that is terrified and fea…
Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years
Olbia

Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years

In 2010, raids took place in Porto Cervo and Olbia, with the villa of an undersecretary of Labour and the residence of a Roman countess also targeted.
Andrea Busia
Ciro Grillo trial: appeal faces immediate risk of postponement
court

Ciro Grillo trial: appeal faces immediate risk of postponement

The defense: "A judge's signature is missing; the first-instance ruling must be retried."
Cabras, the Casula family's historic supermarket is closing: "We can't keep going."
in the center

Cabras, the Casula family's historic supermarket is closing: "We can't keep going."

In Corso Umberto, the shutters will be lowered after 80 years of activity.
Sara Pinna
Sassari: Drunk man hits nurse in ER lip
the violence

Sassari: Drunk man hits nurse in ER lip

The man was arrested by the Carabinieri, and the victim was given ten days of treatment.
Emanuele Floris
Quartu, workshops and guided tours dedicated to tradition
the event

Quartu, workshops and guided tours dedicated to tradition

The “Tramudas” festival, organised by the Sa Cobula association with the natural shopping centre, makes its debut on Thursday
Georgia Daga
The book "Walking in Silence" will be presented in Nuoro.
The meeting

The book "Walking in Silence" will be presented in Nuoro.

The volume edited by researcher Mariella Napolitano will be presented on Friday

A new urban park, an 87-space park-and-ride, and improvements to improve traffic safety . This is the redevelopment plan for the approximately 14,000 square meter area between Via Porto Botte and Via Sironi, near the Caracalla surface metro station in Monserrato: the preliminary technical and economic feasibility study has been approved by the Metropolitan City of Cagliari . The goal is to transform the current unpaved area, currently used haphazardly as a parking lot, into a more functional and attractive public space, also with a view to improving the integration of public transportation, parking, and pedestrian mobility.

The project includes four functional sections, designed to be completed in different phases.

The first involves the creation of a central park with lawns, pedestrian paths, benches, and tall trees, including poplars and cypresses. A small plaza for waiting passengers will also be created near the Caracalla stop, continuing the linear park along the Rio Saliu.

The second phase includes a park-and-ride parking lot with 87 spaces , including four reserved for people with disabilities, as well as spaces for motorcycles and bicycles. The area, covering approximately 3,557 square meters, will also include green areas and draining pavements. Access points will be located on Via Porto Botte and Via Sironi.

The project also includes the reorganization of the traffic flow on Via Porto Botte and Via Sironi , with new parking spaces for residents and localized narrowing of the carriageway near pedestrian crossings, to reduce vehicle speeds and improve safety.

The last intervention concerns the arrangement of the northern part of the existing linear park, through the modification of the differences in level, the creation of new pedestrian connections and additional plantings .

Particular attention will also be paid to rainwater management. The area is located above a manhole of the Rio Saliu: the solutions envisaged, including permeable surfaces and drainage trenches, aim to limit stagnation and promote drainage.

The total cost of the planned works is estimated at €1,406,453.23. Approval represents a step toward completion, but it doesn't mean construction is ready to begin. Further design steps will be necessary.

© All rights reserved