LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 12 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
the summit

New stadium, meeting between the City Council and Cagliari Calcio: "We want a facility for international events."

New discussions with the FIGC and UEFA on Wednesday: "We're aiming to bring Euro 2032 to the city, which would be a great satisfaction for everyone."
Richard Spignesi
28 luglio 2025 alle 14:46Aggiornato il 28 luglio 2025 alle 16:07
In attesa delle preferenze privacy...
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp
Argomenti similiSLOT_5
  • Da che parte sta?
    Caffè Scorretto

    Da che parte sta?

    Tacitus

Articoli correlati

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."
Sassari

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."

In the grounds of appeal, a flurry of objections raised by the lawyers to the regularity of the conviction sentence of the Tempio Tribunal
Andrea Busia
Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.
the alarm

Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.

The verdict from the Teramo zooprophylactic institute is the first case in the municipality.
Roberto Secci
Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."
the emergency

Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."

The prime minister called on the opposition and reassured them in a video on social media: "Nothing was found in the institutions. Those who send these threats want a nation that is terrified and fea…
Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years
Olbia

Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years

In 2010, raids took place in Porto Cervo and Olbia, with the villa of an undersecretary of Labour and the residence of a Roman countess also targeted.
Andrea Busia
Ciro Grillo trial: appeal faces immediate risk of postponement
court

Ciro Grillo trial: appeal faces immediate risk of postponement

The defense: "A judge's signature is missing; the first-instance ruling must be retried."
Cabras, the Casula family's historic supermarket is closing: "We can't keep going."
in the center

Cabras, the Casula family's historic supermarket is closing: "We can't keep going."

In Corso Umberto, the shutters will be lowered after 80 years of activity.
Sara Pinna
Sassari: Drunk man hits nurse in ER lip
the violence

Sassari: Drunk man hits nurse in ER lip

The man was arrested by the Carabinieri, and the victim was given ten days of treatment.
Emanuele Floris
Quartu, workshops and guided tours dedicated to tradition
the event

Quartu, workshops and guided tours dedicated to tradition

The “Tramudas” festival, organised by the Sa Cobula association with the natural shopping centre, makes its debut on Thursday
Georgia Daga
The book "Walking in Silence" will be presented in Nuoro.
The meeting

The book "Walking in Silence" will be presented in Nuoro.

The volume edited by researcher Mariella Napolitano will be presented on Friday

The first meeting of the week between the administration and Cagliari Calcio took place today at the City Hall to discuss the new stadium. This eagerly anticipated meeting comes just days after the club presented its updated project, a step forward toward the construction of the stadium, which will be named after Gigi Riva and is expected to replace the Sant'Elia stadium, abandoned in 2017.

In attesa delle preferenze privacy...
Video di Andrea Artizzu

"The meeting went very well," commented Cagliari Mayor Massimo Zedda. "Cagliari Calcio presented the project; we received it on Friday and are analyzing it. We are conducting checks to determine, in the context of the situation regarding stadiums that need to be adapted for international events, whether Cagliari Calcio should be the first to submit the project ." Also present were Deputy Mayor Maria Cristina Mancini, Councilor for Sport Giuseppe Macciotta, and Daniele Olla, the sole person responsible for the proceedings.

Nuovo stadio di Cagliari, consegnato il progetto aggiornato: il costo aumenta di 40 milioni
l’opera

Nuovo stadio di Cagliari, consegnato il progetto aggiornato: il costo aumenta di 40 milioni

Riccardo Spignesi

The cost of the project has increased by approximately €40 million compared to the project presented in 2022. " The PAUR environmental assessment procedure has been completed ," Zedda recalls. "A postponement was necessary: now we are waiting for the government to provide a response regarding that investment in adapting the sports facilities to host international events , which would provide assistance in the economic and financial plan."

Nuovo stadio di Cagliari, incontro con Figc e Uefa per gli Europei 2032: c’è la data
il vertice

Nuovo stadio di Cagliari, incontro con Figc e Uefa per gli Europei 2032: c’è la data

Riccardo Spignesi

The process has seen a great deal of bureaucratic delays, with Cagliari hoping to submit a tender by the end of 2025 and begin construction in the first half of 2026. A new meeting with the FIGC and UEFA will take place on Wednesday, again at the City Hall . "We will show up with the documents already filed and, likely after the summer break, we will go to the City Council ," Zedda concluded.

Nuovo stadio di Cagliari, la conferenza di servizi dà il via libera sulla compatibilità ambientale
il progetto

Nuovo stadio di Cagliari, la conferenza di servizi dà il via libera sulla compatibilità ambientale

"A very positive meeting: we took stock of the situation, and I think having submitted the final project is a great achievement," added Antonio Romei, Cagliari Calcio's legal advisor. "Now we must focus on the final goal; there's still a lot of work to do ." Also attending for the Rossoblu club were president Tommaso Giulini, general manager Stefano Melis, and engineer Alessandro Gosti.

Nuovo stadio a Cagliari, approvato lo schema di Convenzione: sbloccati i 50 milioni della Regione
la delibera

Nuovo stadio a Cagliari, approvato lo schema di Convenzione: sbloccati i 50 milioni della Regione

The goal is the 2032 European Championships, but not only that. "The cost of the project has increased significantly," Romei recalls, "because Cagliari has accepted the idea of having a stadium with European standards, and the capacity has increased to 30,000 spectators , both for the European Championships and for international events. It's important for the city of Cagliari to have a stadium with these requirements."

Abodi conferma: «Nei prossimi mesi al via i lavori per il nuovo stadio di Cagliari intitolato a Gigi Riva»
Alghero

Abodi conferma: «Nei prossimi mesi al via i lavori per il nuovo stadio di Cagliari intitolato a Gigi Riva»

Fausto Spano

The Rossoblù club, like the Municipality, is confident that the capital will be among the host cities for Euro 2032 (the five venues will be chosen in October 2026). "Cagliari is in the running. We believe we are far ahead of the others: we are at the forefront or close to it , now we must remain so and succeed in bringing the European Championships to Cagliari. It would be a great satisfaction for everyone," Romei concludes.

© All rights reserved