LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 12 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
HomeSardinia
The ceremony

Public housing, in Oristano the keys to 42 lodgings are handed over

The plan for the construction of new housing is being planned and will soon be approved by the Executive

15 marzo 2022 alle 11:59Aggiornato il 15 marzo 2022 alle 13:25
Public housing, in Oristano the keys to 42 lodgings are handed over
(foto Regione Sardegna)
Resta informato su WhatsApp
FacebookXLinkedInWhatsApp
Argomenti similiSLOT_6
  • Da che parte sta?
    Caffè Scorretto

    Da che parte sta?

    Tacitus

Articoli correlati

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."
Sassari

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."

In the grounds of appeal, a flurry of objections raised by the lawyers to the regularity of the conviction sentence of the Tempio Tribunal
Andrea Busia
Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.
the alarm

Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.

The verdict from the Teramo zooprophylactic institute is the first case in the municipality.
Roberto Secci
Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."
the emergency

Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."

The prime minister called on the opposition and reassured them in a video on social media: "Nothing was found in the institutions. Those who send these threats want a nation that is terrified and fea…
Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years
Olbia

Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years

In 2010, raids took place in Porto Cervo and Olbia, with the villa of an undersecretary of Labour and the residence of a Roman countess also targeted.
Andrea Busia
Ciro Grillo trial: appeal faces immediate risk of postponement
court

Ciro Grillo trial: appeal faces immediate risk of postponement

The defense: "A judge's signature is missing; the first-instance ruling must be retried."
Cabras, the Casula family's historic supermarket is closing: "We can't keep going."
in the center

Cabras, the Casula family's historic supermarket is closing: "We can't keep going."

In Corso Umberto, the shutters will be lowered after 80 years of activity.
Sara Pinna
Sassari: Drunk man hits nurse in ER lip
the violence

Sassari: Drunk man hits nurse in ER lip

The man was arrested by the Carabinieri, and the victim was given ten days of treatment.
Emanuele Floris
Quartu, workshops and guided tours dedicated to tradition
the event

Quartu, workshops and guided tours dedicated to tradition

The “Tramudas” festival, organised by the Sa Cobula association with the natural shopping centre, makes its debut on Thursday
Georgia Daga
The book "Walking in Silence" will be presented in Nuoro.
The meeting

The book "Walking in Silence" will be presented in Nuoro.

The volume edited by researcher Mariella Napolitano will be presented on Friday

This morning, in the presence of the Councilor for Public Works, Aldo Salaris, the keys of 42 apartments owned by Area to as many Oristano families.

Access to housing and the improvement of housing conditions for the weakest segments of the population therefore remain at the center of the Region's action. "The housing deprivation affecting the population groups most exposed to the crisis is one of the most widespread social plagues - explained President Christian Solinas - Giving an answer in this sense, by assigning new housing, is a sign of concrete attention aimed at mitigating effects of the economic crisis generated by the pandemic which we are still trying to stem with every means and instrument at our disposal ”.

"The possibility of having a house and the quality of living are a right that we recognize and support", concluded the President, recalling the impressive social housing plan implemented by the Region which has allocated over 17 million euros to date. to the maintenance of the existing housing (4 of which are arriving with the resources of the NRP) while the heritage recovery plan with superbonus is active and the plan for the construction of new housing that the council will approve shortly is being planned.

Public housing, in Oristano the keys to 42 lodgings are handed over
Gli immobili Area (foto Regione Sardegna)

"The house represents the starting point for building one's future. The delivery of 42 apartments in Viale Indipendenza in the Sacro Cuore district of Oristano is a reason for joy and satisfaction because it is a concrete act that affects housing and economic hardship. on housing are a fundamental component of the Region's action, which with dedicated measures and maximum attention to housing is committed to forming a more equitable system, attentive to the needs of the most fragile families and oriented towards the dignity of the people ", he said the commissioner Salaris during the ceremony for the allocation of the apartments, in the presence of the representatives of the Municipality and of the Area.

The conclusion of the works on the buildings took place during the Legislature, with an important acceleration that led in 2020 to the certification of the completion of the works in the main works. In the first months of the year it was then declared practicability.

"The impressive family support activity continues - continued Salaris - On the one hand we are going to support the weakest sections of the population by increasing the offer and on the other, with direct interventions that are affecting various residential centers, in this moment of enormous difficulty, we create development and restart the economy through public housing ".

The apartments in Oristano are equipped with a condominium photovoltaic system for the production of electricity, each accommodation also has a single system for the production of domestic hot water from solar energy, air conditioning systems and, in terms of sustainability, the buildings are equipped with a rainwater collection system to be allocated to the surrounding green areas.

The overall financing (including the demolition of the old buildings and the reconstruction, with the creation of the garage in the basement) on the two buildings that house the apartments is approximately 4.5 million. Another 400 thousand euros already allocated will be used to complete the systems serving the garage and put it into operation.

(Unioneonline / vl)

© All rights reserved