LEGGI IL QUOTIDIANO
LEGGI IL QUOTIDIANOOggi 12 November
L'Unione Sarda English
Abbonati
ITA|ENG|DEU|RUS|CIN
videolina Linkradiolina linkSardegna 1 linkVai online linkPBM link
Read the newspaper
L'Unione Sarda English
Subscribe
L'Unione Sarda

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
L'Unione Sarda

News

  • Cronaca Sardegna
  • Economia
  • Salute
  • Cultura
  • Sport
  • Gossip
  • Turismo

Servizi

  • Necrologi
  • Annunci
  • Pubblicità

Bella Sardegna

  • Spiagge

Iniziative Editoriali

  • Biblioteca dell'identità

Account

  • Abbonati
  • LEGGI IL QUOTIDIANO
ABBONATI A L’UNIONE SARDA

SCARICA L'APP L'UNIONE DIGITAL

Download GoogleDownload apple
videolina Linkradiolina linkVai online linkPBM link

2021 L'Unione Sarda S.p.A. Tutti i diritti riservati. É vietata la riproduzione, anche parziale e con qualsiasi mezzo, di tutti i materiali del sito. | Indirizzo della Sede Legale: Piazzetta L'Unione Sarda nr. 24 | Capitale sociale 11.400.000,00 i.v. | Codice Fiscale ed iscrizione presso l'Ufficio Registro Imprese di Cagliari 01687830925 (P.I. 02544190925) | REA: CA-136248

Cookie e Privacy PolicyModifica impostazioni privacyInformativa commentiCorporate
The ministry rejects the maxi wind farm of Bitti: stop at the blades of over 200 meters
La simulazione del'impianto eolico a Bitti (L'Unione Sarda)
Resta informato su WhatsApp
FacebookX
LinkedIn
WhatsApp

The Ministry of Ecological Transition says no to the maxi wind farm in Mamone, between Bitti , Onani and Buddusò. The company Wpd Piano d'Ertilia Srl, controlled by Wpd Italia, in turn an emanation of the German giant Wpd Group, wanted to build 15 turbines that would have to turn attached to towers "with an indicative height of 149 meters". Colossi that, according to the project, would have generated 3.36 MW of electricity each, for a total of over 50.

They would. Because late Wednesday evening, two years after the project was filed, the negative verdict came from Mite (Directorate General for Environmental Assessments) and the Ministry of Culture, office of the Special Superintendence for the Pnrr.

The provision is concise, just three pages. But the rejection is sound. The general managers Luigi Nocco and Luigi la Rocca, who signed it, retrace the rain of opposition that has come against the project. If you want to use hyperbola, it seems that those gigantic blades (tower of about 150 meters and rotors of 158 meters in diameter, for a total that breaks through 200), to be placed among "imposing masses of granite rocks emerging within which wide deep valleys ”, appealed only to the proponents.

The reassurances of the company were not enough, which in the preliminary reports spoke of a "positive impact on the strategic action to combat greenhouse gas emissions and on air quality".

And he added that "the initiative has significant repercussions and opportunities of a socio-economic nature in favor of companies operating in the area".

The Region, the Ministry of Culture, the municipalities, the ministerial technical evaluation commission and associations opposed it.

And, last but not least, the Infn (National Institute of Nuclear Physics) had also said no . Because, the opinion reads, “the area where the wind farm would be located is a candidate site to host the future Einstein Telescope gravitational wave observatory”. This project is worth one and a half billion euros. Penny plus, cent minus. The observation of gravitational waves requires absolute silence. And the hypothesis of a research work of this kind, for the center of Sardinia, could not be swept away by a blow from the shovel.

© All rights reserved

Argomenti similiSLOT_5
  • Da che parte sta?
    Caffè Scorretto

    Da che parte sta?

    Tacitus

Articoli correlati

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."
Sassari

Grillo's appeal, the defense: "Evidence in our favor was ignored or undervalued, the trial must be retried."

In the grounds of appeal, a flurry of objections raised by the lawyers to the regularity of the conviction sentence of the Tempio Tribunal
Andrea Busia
Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.
the alarm
HomeSardinia
the decision

The ministry rejects the maxi wind farm of Bitti: stop at the blades of over 200 meters

"Environmental incompatibility": the verdict on the plant that would have disturbed the gigantic investment of the Einstein Telescope in the Lula mine
Enrico Fresu
6 ottobre 2022 alle 20:48Aggiornato il 7 ottobre 2022 alle 06:51

Girasole: Mosquitoes test positive for the Usutu virus: Mayor's order comes into effect.

The verdict from the Teramo zooprophylactic institute is the first case in the municipality.
Roberto Secci
Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."
the emergency

Bomb scare, schools aren't closing. Meloni: "They want to scare us, not hit us. We'll react."

The prime minister called on the opposition and reassured them in a video on social media: "Nothing was found in the institutions. Those who send these threats want a nation that is terrified and fea…
Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years
Olbia

Costa Smeralda, the "emery gang" and thefts from dream villas: crimes prescribed after 16 years

In 2010, raids took place in Porto Cervo and Olbia, with the villa of an undersecretary of Labour and the residence of a Roman countess also targeted.
Andrea Busia
Ciro Grillo trial: appeal faces immediate risk of postponement
court

Ciro Grillo trial: appeal faces immediate risk of postponement

The defense: "A judge's signature is missing; the first-instance ruling must be retried."
Cabras, the Casula family's historic supermarket is closing: "We can't keep going."
in the center

Cabras, the Casula family's historic supermarket is closing: "We can't keep going."

In Corso Umberto, the shutters will be lowered after 80 years of activity.
Sara Pinna
Sassari: Drunk man hits nurse in ER lip
the violence

Sassari: Drunk man hits nurse in ER lip

The man was arrested by the Carabinieri, and the victim was given ten days of treatment.
Emanuele Floris
Quartu, workshops and guided tours dedicated to tradition
the event

Quartu, workshops and guided tours dedicated to tradition

The “Tramudas” festival, organised by the Sa Cobula association with the natural shopping centre, makes its debut on Thursday
Georgia Daga
The book "Walking in Silence" will be presented in Nuoro.
The meeting

The book "Walking in Silence" will be presented in Nuoro.

The volume edited by researcher Mariella Napolitano will be presented on Friday
The ear of the universe that could be installed inside the Sos Enattos mine in Lula.

"A negative environmental compatibility judgment is expressed for the" project of a wind farm consisting of 15 turbines with a power of 4.2 MW each, for a total power of 50.4 MW, located in the municipalities of Bitti (NU) and Buddusò (SS) in the locality of Mamone ”, it was decided. Now the company can appeal. And try, again, the assault on the Bitti mountains.